TAS Performs as Promised
When a major project is signed on the dotted line, the service provider’s ability to per- form is always on the back of the buyer’s mind. With today’s fast- paced market in the GCC, it is more important than ever to work with project partners with an established reputation for getting the job done.
Dell Hospital
Dell Children’s Medical Center of Central Texas will open its doors in January 2007 with a state of the art CHP (Cooling, Heating, Power) system. A 170 bed facility, Dell Children’s Medical Center will be served by an on-site 4.3 MW combustion turbine generator, which will recycle waste heat to produce 22,000 lbs/hr of steam for hospital process loads and 900 tons of chilled water from a steam absorption chiller. The plant also includes a 1,500 ton packaged electrical centrifugal chiller plant, a 20,000 lb/hour packaged boiler and a 1,500 kW diesel emergency engine generator.
Baylor Packaged Plant
Baylor College of Medicine (BCM) suffered a significant loss of research data when the facility’s below-grade level was flooded with more than 15 feet of water. As a major research and teaching facility located in Houston, Texas, Baylor College of Medicine serves as the home to many important educational programs and projects, as well as National Institute of Health research grants.